Eau Claire River BankCedar Corporation developed a corrective action plan for the contamination on this site from a manufactured gas plant, which required reconstruction of the riverbank. The project required removal of 15,000 yards of contaminated soils and demolition of two buildings used for the manufactured gas plant. The soil removal included excavating to the river elevations (over 20 feet deep in places) and the entire reconstruction of this point of land. The project also included development of an access trail.

If you have questions about our environmental services, or would like additional information, please e-mail Scott McCurdy or call 1-800-472-7372.